 |
MINIMUM TOTAL ORDER: 25 ribbons (Titles may be mixed -- no minimum on individual titles).
SET-UP FEE: $9.50 each unique set of ribbons (every ribbon that has a change in ribbon text, ribbon color, imprint color, or layout).
| |
25+ |
50+ |
100+ |
500+ |
1,000+ |
2,500+ |
5,000+ |
| Price per ribbon |
0.83 |
0.55 |
0.39 |
0.28 |
0.22 |
0.20 |
0.18 |
METAL DIE FEE: Imprinted ribbons with a logo REQUIRE a metal die ($20.50), additional dies are required for each change in ribbon text, logo, or layout.
A metal die will add 2 additional business days to the total production time.
|
|
|
CLICK ON PANEL TABS TO OPEN
RIBBON COLORS
 |
No color guarantee is made by these images, if an exact match is required please request a material sample.
*These colors are hot-neon bright. The colors do not render well on your monitor.
**Rainbow ribbon, and red-white-blue ribbon are specialty ribbons, add 10¢ per ribbon. |
PRODUCTION AND SHIPPING FOR RIBBONS

Proof time + Production time + Shipping = Total time to delivery |
Proof - A digital proof will be created and emailed to you within 4 business hours. If changes to the paper proof are requested, a new proof will be provided within 24 hours. Production WILL NOT begin until an approved, signed proof is received by Name Tag, Inc.
Production - Once an approved proof has been received, production begins. If the production time and/or the shipping method need to be adjusted to meet your 'need by date' you will be contacted before production begins. Completed orders (with a signed proof and a properly formatted list) must be received by 5:30pm Mountain Time, or they will be processed the next day.Same Day Production is NOT available after 11 AM Mountain Time. |
| Total Quantity |
Number of Title |
Standard Production* |
Expedited Production |
| |
|
|
Same Day |
1 Day |
2 Days |
3 Days |
4 Days |
| 25 to 2,499 |
1-4 |
4 days |
100% |
50% |
-- |
-- |
-- |
| 5-9 |
5 days |
na |
100% |
50% |
-- |
-- |
| 2,500+ |
1-4 |
6 days |
na |
100% |
75% |
50% |
-- |
| 5-9 |
7 days |
na |
na |
na |
50% |
25% |
*Production time includes 2 days for the production of the metal die(s).
Expedited fee will increase the total merchandise cost by the percentage shown.
|
Shipping - Shipping methods (Ground, 2 Day Air, Next Day Air, etc.) will become available once the product has been added to the shopping cart .The standard shipping method is UPS Ground, which will take 1 to 6 days for delivery, depending on your location. Expedited shipping methods are available at an additional cost. You will be able to select your desired shipping method (Ground, 2 Day Air, Next Day Air, etc.) once the order has been added to the shopping cart.
***All packages will be shipped by UPS***
(EXCEPTION: Packages to Military Addresses will be shipped via USPS Priority Mail).
|
 |
|
|